SWP3 Design Service

 

Our SWP3 design service consists of the development of a site specific Storm Water Pollution Prevention Plan which, as of the date of delivery, will be compliant with the TCEQ's General Permit TXR150000.  This service includes 2 bound copies and a single non-bound copy of the compliant SWP3.  Our SWP3 incorporates the erosion control plan developed by the Civil Engineer for the project.  If an erosion control plan has not been prepared prior to SWP3 development, we can develop one for an additional fee.  Our SWP3 design service also consists of providing the required on-site posting for compliance as well.

We can now accept online payment for our standard SWP3 design services.  This price will cover the development of the SWP3 narrative along with the required on-site signage.  Payment of the TCEQ's permit fee for projects disturbing 5 acres of more is not included.  It can be paid for via the link to the left.

Once the Paypal process is complete, login using the Login:NOIGuest and Password:noiguest.